Dallas Office · Vertical Headquarters

Digital InfrastructureHQS

The physical backbone of the AI and cloud economy — hyperscale data centers, fiber routes, edge nodes, and the substation and water infrastructure that make them possible.

The physical backbone of the AI and cloud economy — hyperscale data centers, fiber routes, edge nodes, and the substation and water infrastructure that make them possible. We underwrite for power availability and multi-decade tenant commitments.

Focus Areas

Where we underwrite conviction.

01

Hyperscale Data Centers

50MW+ campuses purpose-built for hyperscaler and AI training tenancy with 15-year+ leases.

02

Edge & Colocation

Sub-10MW edge facilities positioned at the intersection of population density and low-latency demand.

03

Fiber Corridors

Long-haul and metro fiber real estate — huts, POPs, and easement portfolios.

04

Power-Ready Land

Entitled sites with interconnect and substation capacity for future data-center development.

Platform Metrics

By the numbers.

$232B
Committed across data infrastructure
28 campuses
Hyperscale, edge, and colocation
2.4 GW
Aggregate contracted power capacity (target)
15+ yr
Weighted lease term at signing
Global Headquarters

Dallas, TXHQS

Digital Infrastructure Vertical
1910 Pacific Ave Suite 2000 Dallas, TX 75201
Fund Platform

Funds & Allocations

Funds
8
Total Allocation
$232B
FundFund Size
PCC Digital Infrastructure Fund I$30B
PCC Digital Infrastructure Fund II$30B
PCC Digital Infrastructure Fund III$30B
PCC Digital Infrastructure Fund IV$26B
PCC Digital Infrastructure Fund V$30B
PCC Digital Infrastructure Fund VI$30B
PCC Digital Infrastructure Fund VII$30B
PCC Digital Infrastructure Fund VIII$26B
Total — Digital Infrastructure$232B
Illustrative — Representative Asset

Pacific Avenue Data Campus

Dallas MSA, TX
3-building hyperscale campus · 120 MW contracted · 780,000 SF · dual-utility interconnect

Anchor campus in North Texas with committed power and diverse fiber, structured on a 20-year triple-net with rent escalators.

Anchor tenant: Investment-grade hyperscaler (representative)

Market Context

Underwriting environment

Real-world data grounding the thesis
$650B
Global data-center capex through 2028 (est.)
4.1% cap
U.S. data-center average Q4 2024
+22 GW
N. American data-center demand 2024–2027

Serious capital for digital infrastructure.

Qualified LPs and institutional partners can request the full data room and current allocation window.

Request LP Access